CBC Building 7 270,102.270800 semester control

Affiliates: 0,11 $ — how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 1
Refunds: 0

Uploaded: 05.03.2013
Content: 30305200119727.rar (3319,79 kB)

Seller

den_2000 information about the seller and his items
offlineAsk a question

Seller will give you a gift certificate in the amount of 10,91 RUB for a positive review of the product purchased..

Description

Water supply
Metrology
Sociology
Structural mechanics
Construction machinery
Heat and ventilation
Business sector

Additional information

Water supply

The plan of the work performed

1. Water intake facilities for the abstraction of water from a surface source.
2. Modes water consumption rates. Stepped and integrated graphics of uneven water consumption - their essence, purpose.
3. The pressure in the external network.
4. The main elements of the wastewater.
5. The outer rain water taking network.
6. Receivers wastewater.
7. List of used literature

Metrology

The aim is to obtain redress
measurement with the definition of its error (taking into account, when
the need for systematic and random components). Option
setting gives the teacher discipline. Initial data
taken line embodiment in accordance with the following
table or outstanding teachers individually

Sociology

The theme of "social conflict"

The plan of the work performed

1. Introduction.
2. Social conflict: the main characteristics, development stages.
3. The typology of social conflicts.
4. The social functions of conflict.
5. Conclusion.
6. List of used literature

Structural mechanics

1. The calculation of a multiple-hinged beam
2. Determination of displacements in statically determinate beam
3. Determination of displacements in statically determinate frame


Construction machinery

The plan of the work performed

1. machines for loading and unloading.
2. Running equipment.
3. Construction cranes.
4. List of used literature.

Heat and ventilation

The plan of the work performed

1. Main circuit water heating systems with artificial circulation.
2. The classification scheme and steam heating systems.
3. Mechanical ventilation.
4. What is meant by the first and second terms of comfort?
5. The use of gas in the building.
6. The decision of the control tasks.
7. List of used literature.

Business sector

The plan of the work performed

1. Introduction.
2. The calculation of the main indicators of capital investment plan.
3. Development of a title list of construction projects.
4. Conclusion.



Feedback

1
получил то, что было необходимо, содержание соответствует описанию2015-04-20
Period
1 month 3 months 12 months
0 0 0
0 0 0
Seller will give you a gift certificate in the amount of 10,91 RUB for a positive review of the product purchased..
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.com the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)