upgrade option combustion chambers install GT-750-6

Affiliates: 0,09 $ — how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Refunds: 0

Uploaded: 28.10.2013
Content: 31028164805950.zip (1008,19 kB)

Description

Contents

Introduction 10
1 Technological part 12
1.1 The combustion chamber 12
1.2 General characteristics of the combustion chamber 16
1.3 Description of the structure of the combustion chamber 17
1.4 Fuel distribution system 20 of the combustion chamber
1.5 Ignition of the combustion chamber 22
1.6 The central burner 23
1.7 Peripheral burner 25
1.8 front device 23
1.9 Mixer combustor 28
1.10 Cover the combustion chamber 28
1.11 The case of the combustion chamber 28
1.12 Measurement 28
1.13 Packaging 29
1.14. Instructions for installation, start-up and commissioning of 29
1.14.1 General requirements 29
1.14.2 Mounting 29
1.14.3 The procedure for the commissioning of 32
1.15 The use of the combustion chamber 33
1.15.1 Requirements for the safety in the operation of 33
1.15.2 Operating limits 33
1.15.3 Instructions for use 34
2 Special Part 36
2.1 Modernization of the burner combustion chamber 36
2.2 Calculation of power GTU 43
2.3 Maintenance and repair of gas turbine plant 45
45 2.3.1 Types of repairs
2.3.2 Preparing for repair 52
2.3.3 Dismantling the GTU 53
2.3.4 Cleaning, cleaning parts and assemblies GTU 54
2.3.5 Alignment of the rotor 55
2.3.6 Measuring instruments 57
2.3.7 inspecting components and assemblies 60
2.3.8 Repair of other units and parts, balancing 61
3 The economic part 63
3.1 Method of calculating the economic impact of modernization burner
combustion chamber 63
3.2 Calculation of the economic effect of modernization of the burner combustion chamber 70
4 Safety and environmental project 76
4.1 Identification and analysis of potential hazards 76
4.1.1 Analysis of the impact of the object on the working conditions 76
4.1.2 Analysis of possible emergency situations 80
4.1.3 Analysis of potential hazards affecting the environment 82
4.1.3.1 The impact of an object on the air 82
4.1.3.2 The impact on the water resources of the object 83
4.2 Measures to ensure the safety and environmental performance of the project 83
4.2.1 Measures to ensure safe working conditions 83
4.2.2 Measures to ensure the safety of the facility at 89
Emergency 91
4.2.3 Measures for environmental protection 91
4.2.3.1 Measures for Air Protection 91
4.2.3.2 Measures for the protection of water resources 91
4.2.3.3 Waste Disposal 94
Conclusion 98
Bibliographic list 99

Additional information

In this thesis project examined the option of upgrading the cameras will burn-installation of GT 750-6.
The proposed modernized burner combustion chamber is designed to improve the technical and economic parameters of GTU (capacity increase, reducing fuel gas consumption, reduction of harmful emissions into the atmosphere).
The technological calculations and technology upgrading cameras CDF-Rania GT-750-6. Carried out calculations of economic efficiency modernization measures ka-combustion installation GT-750-6 through the introduction of a new design of the central burner. We consider safety and environmental project. Issues covered-sy labor protection, environmental protection, propose measures to address emergencies.

Feedback

0
No feedback yet.
Period
1 month 3 months 12 months
0 0 0
0 0 0
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.com the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)